Screed should be firm enough to walk on before tiling can begin.
Tiling on new screed floor.
A number of factors can affect how long a newly poured screed floor takes to fully cure and it s important to remember.
Allowing fast track installations on new concrete after seven days and new cement sand screeds after 24 hours bal new floor is suitable for fixing ceramics porcelain and vitrified tiles in dry or wet interior and exterior environments.
If you have a brand new freshly laid screed floor lay a plastic foil down before installing laminate panels.
Green screeds are usually 1 3 or 1 4 cement and sand at a usual thickness of 50mm.
Make sure your screed is completely dry the main pitfall when preparing a new screed floor for tiling is beginning work before the screed is properly dry.
Bal new floor is a standard setting flexible tile adhesive for new cement and concrete floors.
Tiling onto green screeds or concrete.
These screeds can be applied both bonded directly onto a concrete base or un bonded applied on to a polythene sheet damp proof membrane.
How to prepare a new screed floor for tiling.
The top surface of screeds may need to be scored sanded or keyed in preparation to accept the primer and floor tiling adhesive sanding keying etc.
Of the screed surface allows the penetration of primers.
Some laminate panels may have built in plastic foils or something similar.